The scheme of reducing the speed of the bridge crane in
π Energetics
π€ ΠΠΌΠΈΡΡΠΈΠΉ I
Product Description
Proposal to limit the speed of the bridge crane when approaching the marginal zone of the shop. With asynchronous motors with a phase rotor. Near the parking zone of the crane, a boom is installed, which switches the limit switch on the crane bridge to a position that excludes all speeds on the controller, except the minimum one.
Additional Information
The file in Compass-15 format
No Reviews Yet
Be the first to leave a review for this product!
Related Products
Reconstruction project of 110 kV substation "Zapadnaya"
Seller: but_by_K
The control circuit of the pump with auto start after t
Seller: ΠΠΌΠΈΡΡΠΈΠΉ I
The inclusion of current relay RTZE-250 in the control
Seller: ΠΠΌΠΈΡΡΠΈΠΉ I
The scheme of turning on of the pump via the frequency
Seller: ΠΠΌΠΈΡΡΠΈΠΉ I
Furnace waste oil
Seller: XpoH
More from this Seller
Electric circuit bridge crane
For Education Students